Support|0808 234 0680

Search

Advanced SearchOpens new dialog
Search Tips

Carnival Liberty (LI) Fact Sheet

Published 03/12/2015 10:31 PM   |    Updated 02/05/2024 04:55 PM

Shipyard: Fincantieri Cantieri Navali Italiani, Italy
Inaugural cruise: July 20, 2005
Godmother: Mira Sorvino, Oscar-Winning Italian-American Actress
Country of registry: Panama
Cost: $500 million
Cruising speed: 21 knots

 

Size/Capacity

  • Gross tonnage: 110,000
  • Length: 952 feet
  • Beam: 116 feet; 125 feet at pool deck
  • Maximum draft: 27 feet
  • Occupancy based on 2 guests per stateroom: 2974 (1487 staterooms)
  • Full guest occupancy: 3966
  • Passenger decks: 13
  • Space ratio: 37:1

 

Crew

  • Total officers and crew: 1160
  • Officers: International
  • Hotel and cruise staff: International

 

Accommodations
1487 Total Guest Staterooms (including 29 accessible staterooms)

  • 2 Captain’s Suites
  • 10 Grand Suites
  • 42  Ocean Suites and Junior Suites
  • 521 balcony staterooms
  • 327 ocean view staterooms
  • 564 interior staterooms
  • 10 ocean view upper/lower staterooms
  • 11 interior upper/lower staterooms

All staterooms feature: telephone, 110 AC power outlet, individual climate control, Carnival Home™ Signature Bedding Collection, hair dryer, safe, non-stocked mini bar unit and flat-screen TV


Life Saving Equipment - Grand Total Life Saving Capacity: 6195

  • 24 Life Boats (occupancy each: 150 / total occupancy: 3600)
  • 2 Rescue / Water Shuttle Boats (occupancy each: 60 / total occupancy: 120)
  • 35 Launchable Life Rafts (occupancy each: 35 / total occupancy: 1225)
  • 35 Life Rafts (occupancy each: 35 / total occupancy: 1225)
  • 1 Life Raft (occupancy: 25)

 

Maintenance Schedule

  • Dry Dock: 10/04/08-10/18/08
  • Dry Dock: 10/08/11-10/22/11
  • Dry Dock: 12/01/16-12/16/16 
  • Dry Dock: 9/14/21-9/28/21
  • Dry Dock: 5/17/25-7/05/25


Ship Refurbishments and Renovations

Completed During Dry Dock 9/14/21-9/28/21

  • Routine hotel maintenance and cosmetic enhancements
  • New red, white and blue hull design and paint scheme

 

Completed During Dry Dock 12/01/16-12/16/16

  • Routine hotel maintenance and cosmetic enhancements
  • Crew area renovations


Completed During Dry Dock 10/08/11-10/22/11

  • Routine hotel maintenance and cosmetic enhancements
  • Replaced old TVs with new Flat Screen TVs in all staterooms
  • Converted 18 Family Staterooms to Balcony Staterooms (Category 8F)
  • Cherry on Top – located Promenade Deck 5 forward (replaced Formalities)
  • Hot & Cool Dance Club, now referred to as a ‘Night Club’ – refurbished
  • Serenity – located Sun Deck 12 forward/Sky Deck 14 forward
  • Lido Restaurant: Burrito Bar no longer exists
  • RedFrog Rum Bar – located Lido Deck 9 midship, pool area
  • BlueIguana Tequila Bar – located Lido Deck 9 midship, pool area
  • Alchemy Bar – located Promenade Deck 5 aft (replaced the wine bar)
  • EA Sports Bar – located on Promenade Deck 5 forward (replaced the original sports bar)
  • Guy’s Burger Joint – located Lido Deck 9 midship, pool area
  • Blue Iguana Cantina – located Lido Deck 9 midship, pool area


Completed During Dry Dock 10/04/08-10/18/08

  • Routine hotel maintenance and cosmetic enhancements
  • Empress Room converted to Circle "C" lounge for young teens.
  • Addition of 2 deluxe penthouse suites on Lido Deck 9.
  • Lido Deck - open flame barbeque grill

 

Was this answer helpful?